Construction projects
Construction is the single biggest industry in the UK, turning over more than £80 billion of business each year and employing 1 in 14 of the total workforce. It has a global reputation for world class design, inspired architecture and the highest quality building.

Most people don't appreciate the true scale of the industry and of the people who work in it. For example, did you know that 35% of construction workers are self employed, or that we welcome almost 90,000 new employees every year?

Use the dropdown menu to learn more about some of the most exciting and innovative UK construction projects from the past few years.
Cairngorm Funicular Project

Image of the Cairngorm Funicular project

Most of us don't mind the odd drop of rain now and again, but the construction team for the Cairngorm mountain railway had to deal with rather more than that. Working within the delicate natural environment of Britain's largest nature reserve, they encountered winds of 120 miles per hour, snow in June and thousands of wayward skiers every winter - and they still got the job done!

They were there to build a 2km long funicular railway - essentially a cable car system on rails with the carriages pulled up and lowered down the track from a drive system at the top station.

Being such a sensitive environment, it was the team's priority to minimise any damage to the surrounding land. 6000m2 of turf was removed and stored; even the soil underneath was bagged up and labelled. Lichen and moss-covered boulders were kept and reinstated 'sunnyside up' at their original locations.

To make things even more complicated, everything needed to build the railway had to be taken up the mountain without touching the ground - by cableway or helicopter.

Despite the difficulties, the team managed to get the project finished and the mountain back to the way it was. Apart from the new railway, you'd never know they'd been there!

Facts and Figures

The top station is at 3600ft near the top of Cairngorm, where the highest recorded windspeed is 171 m.p.h.

At one point, the team had to clear 7m of snow before they could start work.

The cableway was needed to transport:

11000 tonnes of concrete to build the 93 bases and columns for the railway, 21000 concrete blocks, 190 concrete beams each 18m long and weighing 8 tonnes, and the materials for the 250m long tunnel and the two stations.

The bConstructive website
Training & Learning
National Construction College
bConstructive Apprenticeships

About us

Site map

print page

Print this page



Terms & Conditions

|

Privacy Policy

|

Accessibility

|

The Levy

|

Purchasing

|

Cymraeg

|

Contact us

CITB-ConstructionSkills is a Registered Charity (Registration Number 264289)